|
Viewing 1 - 9 out of 13 Blogs.
Page:
1 |
|
Got the Gargoyles on the columns, put spotlight on Deathstalker, got the three trees lit up.
Still rainy. Finished lighting the Gargoyles on the base, hope to try them on the columns tomorrow.
Rainy. Got the three trees set in the yard, started mounting and lighting gargoyles on plywood bases.
Got the big spider web and spider up, got Billy Bob up, got one window boarded up and the curtains on the other windows. Put the 2 gargoyles, Spike, and Chester up temporarily because tonight was homecoming and we had lots of traffic tonight. Hope to get the gargoyles mounted this weekend, Spike and Chester usually don't go up till Halloween morning.
Using today to catch up on chores around the house. I did finally get the small vulture mounted on the sign.
Feeling much better today, Got the organ mostly fixed up and got it lit up. Still not nearly enough time left in the day after work.
Long day today, not feeling so hot, tired or maybe stressed (not because of Halloween  ) so didn't get much done. Got 2 flood lights working on the tombstones and crosses, and got the trees trimmed back so everything is easier to see from road.
Work sure cuts into my setup time.  Got the skull lights wired up and working, also got the lights on the columns and sign working. Found and set up Celtic cross tombstone. Tried to install small vulture on top of sign, first attempt did not work, believe I know how to do it now but have to wait till tomorrow after work so I will have some daylight to drill.
Page:
1 |
|
|